Haizikou Power Station
The altitude is 1,183m.The dam of the power station is
153m high and the top width is 4m, with the pier distance of 6m and the anti-earthquake
strength of 12-magnitude. Five spillways are provided.The power stationlocates
136m underground with hydraulic head over 80m. There are four sets of units in
total. The total installed capacity is 19 thousand KW, with an annual energy
output of85 million KW. It is a typical power station with the minor supply but
the high water head and also the deepest underground power station in
China.There are three floors of the whole underground power houses: the top
floor is power floor, the second is pump floor and the third accommodates hydraulic
turbine units.Haizikoupower station was designed by Soviets. The construction
began in 1958 and it took 9 years to finish. The first unit formally started to
generate electricity at 17 o'clock on Feb 5, 1967.At present, Haizikou power station
only serves theKeketuohai Town.